Offshore Wind Farms at Akita Port and Noshiro Port
Overall Construction Time Record
Construction Record (Onshore Construction)
Onshore Transmission Lines and Substation at Akita Port
2021/11/17
Restoration construction of main pavement on the underground conduit for electric cables.
To remove temporary pavement and to lay main pavement.
2021/08/31
Completion of construction for onshore step-up substation.
The onshore step-up substation has become operative since September 2, 2021.
2021/08/04
Aluminium container installation work at step-up substation.
To install raised-floor to store cables of control unit for wind power station and substation.
2021/07/13
Equipment installation work at step-up substation.
To install a power receiving device on the completed foundation.
2021/06/17
Equipment installation work at step-up substation.
To install a transformer on the completed foundation.
2021/05/31
Foundation work at step-up substation.
To pour concrete into the area of reinforcing bars and smooth the surface.
MORE
Onshore Transmission Lines and Substation at Noshiro Port
2021/11/20
Restoration construction of main pavement on the underground conduit for electric cables.
To remove temporary pavement and to lay main pavement.
2021/10/05
Completion of construction for onshore step-up substation.
The onshore step-up substation has become operative since October 5, 2021.
2021/09/16
Installation of optical cables at port facility.
To install optical cables which monitor and control wind turbines.
2021/08/26
Cable installation work at step-up substation.
To connect cables transmitting power from wind power station to substation equipment.
2021/07/26
Equipment installation work at step-up substation.
To install a transformer on the completed foundation.
2021/06/29
Foundation work at step-up substation.
To pour concrete into the area of reinforcing bars and smooth the surface.
MORE