OUR
PROJECT

This project is to implement the construction, operation and maintenance of the bottom-fixed offshore wind farms at Akita Port (13 x 4.2MW wind turbine) and Noshiro Port (20 x 4.2MW wind turbine) with approximately 140MW in total electric power to be sold to Tohoku Electric Power Co., Inc. for 20 years under a power purchase agreement (PPA) and also the onshore substation and transmission lines. The construction is in progress towards the commercial operation expected before the end of 2022.

Project

Site Location
Akita Port and Noshiro Port in Akita Prefecture
Installed Capacity
Approximately 140MW
Project Cost
Approximately 100 billion Japanese Yen
Generation Type
Bottom-fixed offshore wind farm
Off-taker
Tohoku Electric Power Co., Inc.
Duration of PPA
20 years

Layout

13 wind turbine at Akita Port and
20 wind turbine at Noshiro Port
(Photos are conceptual drawings at completion)

Akita Port

Noshiro Port

※The perspectives above are images and could be different from real completion.