NEWS

The 2nd ship (loaded with wind turbine element) has arrived at Akita Port

On Friday 24 December, the 2nd ship loaded with 17 nacelles and 30 blades as wind turbine element arrived at Akita Port.
 
The ship departed from Esbjerg Port in Denmark and entered Akita Port this time. We plan to sequentially carry in wind turbine element (towers, nacelles, blades) at Akita Port towards the offshore wind turbine installation scheduled to start in Spring next year.